The North Carolina facility is equipped with ERP1 and ERP2 systems. ERP1 is used for shredding and material separation. ERP2 is used for further separation, particularly non ferrous metals and plastics.
2710 Weck Drive Durham, North Carolina USA 27713 Tel: 1-919-544-1443 Fax: 1-919-433-1997
Service & Products:
Processing Capacity: 18,000,000 pounds
Site: 100,000 square feet
Standards: